Back to Annual Meeting Program
Operating Room Cost versus Outcome in Elective Colectomy: Do You Get what You Pay for?
Victor E Pricolo, *Pamela Escobar, *Filomena Curley, *Kay Hayworth, *Steven Reinert Rhode Island Hospital, Brown Univ., Providence, RI
Objectives: The study objective was to correlate operating room costs of elective colectomies with outcome. Design: Retrospective observational study. Statistical analysis included t-test, ANOVA and Spearman correlation. Setting: Tertiary care academic medical center. Patients: 114 consecutive patients who underwent an elective colectomy were analyzed collectively and in subgroups by type of operation: Right colectomy laparoscopic, Right colectomy open, Left colectomy laparoscopic, Left colectomy open, Total colectomy/proctectomy, Laparoscopic converted to open colectomy (table 1). The total operating room cost was calculated for each patient as charges for equipment utilized plus personnel cost by increments of time. Main Outcome Measures: Outcome was expressed as a weighted numerical score for each patient, ranging from 0 to 10. The score took into account hospital length of stay, minor and major complications; e.g. a length of stay of less than four days without complications was a 10; a postoperative death a 0. Results: For the entire group, cost ranged from $387 to $8262 (mean = $2176 ± 1244). The mean outcome score was 8.01 ± 2.4 (p = 0.091) (scatter graph). The cost versus outcome data and analysis per subgroup is reported in table 1. Conclusions: Higher operating room expenditures did not achieve a superior outcome for elective colectomy in this study. This preliminary work may prompt further analyses of resource utilization versus outcome in surgical practice.
Table 1Procedure | N | $Cost±SD | Outcome±SD | p value | R - lap | 29 | 2165 ± 629 | 9.03 ± 1.95 | 0.6855 | R - open | 21 | 1318 ± 515 | 8.24 ± 2.51 | 0.4194 | L - lap | 10 | 2392 ± 484 | 8.70 ± 2.67 | 0.4404 | L - open | 26 | 1970 ± 1060 | 7.38 ± 1.83 | 0.0681 | Tot/proct | 22 | 3043 ± 2097 | 6.77 ± 2.65 | 0.4486 | Lap to open | 6 | 2585 ± 516 | 8.33 ± 1.75 | 0.5979 |
Back to Annual Meeting Program
|
|